Quality Control

Main QC Procedure For Mould Building

1.Mould design internal review
2.Final mould design review and approved by customer
3.Steel hardness inspection
4.Moldbase inspection
5.Electrodes inspection before EDM
6.Part dimension inspection after each process
7.Mould standard parts receiving inspection
8.Pre-assembly inspection
9.Mould trial inspection
10. Samples inspection
11.Mould shipment final inspection
12.Export mould package inspection


Main QC Procedure For Injection Moulding

1.Mould inspection
2.Resin receiving inspection
3.Product appearance inspection
4.Product dimension inspection
5.Assembly inspection
6.Secondary process inspection
7.Final inspection
8.Package inspection


  


  Optical Projector



    CMM


Precision Height Gauge

 

As a certified ISO9001:2000 company, BT Mold has perfect Quality Control System. Our QC department owns advanced measuring equipment. Such as coordinate measuring machine, optical projector, hardness detector and digital height gauges etc.


At BT Mold, the quality process starts at the very beginning of each project. Once the CAD data received, the mould is to be designed, manufactured, tested and all of these activities are carried out in our factory with strict quality control guidelines. We are confident that our QC team will ensure the quality of product with advanced equipments, which we are always updating to cater to the demand of customers.
 

 

 

   